This Hotel is under construction and will be finished in January 2020. All 155 Guestrooms and public areas are equipped with a vds approved OH System using different type of HSP nozzles. In total there are around 1000 nozzles installed. A big part of these is connected via special high pressure hoses to have the full flexibility in positioning the nozzles. It is a general policy of the CitizenM Hotel Group to equip their hotels with High Pressure Water Mist System. The central pump system is a 4+1x120l/min pump system, connected with a storage tank for 60 min. discharge time.
CitizenM Hotel
Zurich, Switzerland
