Downloads
Partner Log-In

Telekom Münster

In April, the first Telekom large-scale energy storage facility was opened in Münster,  it is  operated by the Telekom subsidiary PASM.

The storage facility, which has a capacity of 2x 6 MWh, temporarily stores  surplus solar and wind energy and releases it again when required.

The plant therefore helps to stabilise the grid, and thus supports the integration of renewable energies.

The large storage system is divided into two areas with different battery systems.

On behalf of Strabag, we at FOGTEC are protecting this pioneering storage technology system with a high-pressure water mist system.

The opening took place in a festive setting on 24 April in Münster with the participation of all the project partners.

Telekom 1
Telekom 1

External Content from Brevo
This section contains our newsletter subscription form. To display this content, your consent is required to transfer data to external servers.

More Information

Telekom Münster

Your email has to be confirmed. Check your inbox!

Your email has to be confirmed. Check your inbox!

Your download is awaiting activation!

"*" indicates required fields

Name*
This field is hidden when viewing the form
This field is hidden when viewing the form